Civilcrete was engaged by Quarry Solutions to undertake and project manage the civil construction side of the project build. This encompassed the following works to achieve a high-quality outcome:
- Manufacture/construction under licence of mass concrete blocks designed by QS for the purpose of constructing high strength load out bin separation walls, retaining wall system for ROM construction.
- Mass excavations for concrete footings/ fixed plant bases.
- Installation and laying of direct laid electrical cables, conduits for communications.
- Installation of poly water delivery pipework inclusive of electrofusion coupling welding.
- Operation of onsite concrete batch plant capable of 100m3 of N40 concrete per hour.
- Form, steel fix, place, pour and finish concrete: – slabs up to 300mm thick, pedestals, plinths, wheel stops, heavy equipment workshop plus other specialized concrete works.
- Construct and install haul truck axle weighing scales.
- Other construction projects to enhance quarry operations.